FIRMQUARRYResearch workspace

GOVERNMENT CONTRACT / DEFINITIVE CONTRACT

CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.

Awarded to DOBCO INC

PIID W912DS21C0002US · USAspendingConstruction
$3.4M
Data last updated Oct 22, 2026 · Source: USAspending
Transaction obligation$3,445,350sum disclosed on award record
Current contract valueNot reportednot interchangeable with obligation
Potential contract valueNot reportedincluding options if reported
Award dateDec 4, 2020
Company legal name
DOBCO INC
UEI / CAGE
CAG6H3QWFWV6 / Not reported
Parent award
Not reported
Awarding agency
Department of Defense
Subagency
Department of the Army
Industry
Construction
NAICS
236220
PSC
Y1CZ
Performance period
Not reported — Not reported
Recipient address
1 GEOFFREY WAY, WAYNE, PASSAIC, NJ, 07470
Place of performance
WEST POINT, ORANGE, NY, 10996
Source last modified
Oct 23, 2026

Description

CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.

View federal source ↗

Derived from official transactions

Contract lifecycle

  1. Contract modified

    CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.

    US · usaspendingSource ↗
  2. Value increased

    CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.

    US · usaspending$495.4KSource ↗
  3. Award announced

    CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.

    US · usaspendingSource ↗
  4. Contract modified

    CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.

    US · usaspendingSource ↗
  5. Value increased

    CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.

    US · usaspending$2.9MSource ↗

Point-in-time model

Contract change outlook

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Uncollapsed source history

Transactions and modifications

Action dateModificationAction typeExact obligationCurrent totalPotential totalDescriptionSource
Jun 25, 2026A00045B$495,389.34Not reportedNot reportedCONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.USAspending ↗
May 18, 2026P00015D$2,949,960.47Not reportedNot reportedCONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.USAspending ↗