THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE 35% DESIGN.

Awarded to HDR AND TEHAMA JOINT VENTURE

PIID FA309922F0007US · USAspendingOther
$281.7K
Data last updated Oct 22, 2026 · Source: USAspending
Transaction obligation$281,739sum disclosed on award record
Current contract valueNot reportednot interchangeable with obligation
Potential contract valueNot reportedincluding options if reported
Award dateAug 15, 2022
Company legal name
HDR AND TEHAMA JOINT VENTURE
UEI / CAGE
L28MDA5NVJY4 / Not reported
Parent award
Not reported
Awarding agency
Department of Defense
Subagency
Department of the Air Force
Industry
Other
NAICS
541330
PSC
C1EB
Performance period
Not reported — Not reported
Recipient address
1600 GENESSEE ST STE 754, KANSAS CITY, JACKSON, MO, 64102
Place of performance
LAUGHLIN AFB, VAL VERDE, TX, 78843
Source last modified
Nov 3, 2026

Description

THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE 35% DESIGN.

View federal source ↗

Derived from official transactions

Contract lifecycle

  1. Contract modified

    THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO EXTEND THE POP BY 55 CALENDAR DAYS. THE REASON FOR THIS TIME EXTENSION IS TO ACCOUNT FOR TIME NEEDED TO INCORPORATE DIV 01 SPECS AN

    US · usaspendingSource ↗
  2. Contract modified

    THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE 35% DESIGN.

    US · usaspendingSource ↗
  3. Award announced

    THE PURPOSE OF THIS PROJECT IS TO COMPLETE A 100 DESIGN TO REMOVE THE EXISTING HIGH EXPANSION FOAM SYSTEM (HEFS) IN BUILDING 50 HANGAR 1 AND REPLACE WITH AN AUTOMATIC WATER SPRINKL

    US · usaspendingSource ↗
  4. Value increased

    THE PURPOSE OF THIS PROJECT IS TO COMPLETE A 100 DESIGN TO REMOVE THE EXISTING HIGH EXPANSION FOAM SYSTEM (HEFS) IN BUILDING 50 HANGAR 1 AND REPLACE WITH AN AUTOMATIC WATER SPRINKL

    US · usaspending$281.7KSource ↗

Point-in-time model

Contract change outlook

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Uncollapsed source history

Transactions and modifications

Action dateModificationAction typeExact obligationCurrent totalPotential totalDescriptionSource
Apr 7, 2023P00002BNot reportedNot reportedNot reportedTHE PURPOSE OF THIS BILATERAL MODIFICATION IS TO EXTEND THE POP BY 55 CALENDAR DAYS. THE REASON FOR THIS TIME EXTENSION IS TO ACCOUNT FOR TIME NEEDED TO INCORPORATE DIV 01 SPECS AND ADDITIONAL 65% AFCEC REVIEW COMMENTS IN THE 95% DESIGN PACKAGE.USAspending ↗
Nov 1, 2022P00001BNot reportedNot reportedNot reportedTHE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE 35% DESIGN.USAspending ↗
Aug 15, 20220Not reported$281,739.27Not reportedNot reportedTHE PURPOSE OF THIS PROJECT IS TO COMPLETE A 100 DESIGN TO REMOVE THE EXISTING HIGH EXPANSION FOAM SYSTEM (HEFS) IN BUILDING 50 HANGAR 1 AND REPLACE WITH AN AUTOMATIC WATER SPRINKLER SYSTEMUSAspending ↗