GOVERNMENT CONTRACT / DELIVERY ORDER

DESIGN-BUILD CONSTRUCTION OF A NEW WEIR OPENING AT THE SITE OF THE MCCLELLAN-KERR ARKANSAS NAVIGATION SYSTEM, THREE RIVES, PRE-CONSTRUCTION, ENGINEERING AND DESIGN (PED), DESHA AND

Awarded to BFBC LLC

PIID W9127S22F0082US · USAspendingConstruction
$175.9M
Data last updated Oct 22, 2026 · Source: USAspending
Transaction obligation$175,850,000sum disclosed on award record
Current contract valueNot reportednot interchangeable with obligation
Potential contract valueNot reportedincluding options if reported
Award dateJul 19, 2022
Company legal name
BFBC LLC
UEI / CAGE
PTZXAS7WKA23 / Not reported
Parent award
Not reported
Awarding agency
Department of Defense
Subagency
Department of the Army
Industry
Construction
NAICS
237310
PSC
Y1PZ
Performance period
Not reported — Not reported
Recipient address
701 GOLD AVE, BOZEMAN, GALLATIN, MT, 59715
Place of performance
TICHNOR, ARKANSAS, AR, 72166
Source last modified
Nov 3, 2026

Description

DESIGN-BUILD CONSTRUCTION OF A NEW WEIR OPENING AT THE SITE OF THE MCCLELLAN-KERR ARKANSAS NAVIGATION SYSTEM, THREE RIVES, PRE-CONSTRUCTION, ENGINEERING AND DESIGN (PED), DESHA AND ARKANSAS COUNTIES, AR (HISTORIC CLOSURE STRUCTURE - 145), TICHNOR, AR

View federal source ↗

Derived from official transactions

Contract lifecycle

  1. Award announced

    DESIGN-BUILD CONSTRUCTION OF A NEW WEIR OPENING AT THE SITE OF THE MCCLELLAN-KERR ARKANSAS NAVIGATION SYSTEM, THREE RIVES, PRE-CONSTRUCTION, ENGINEERING AND DESIGN (PED), DESHA AND

    US · usaspendingSource ↗
  2. Value increased

    DESIGN-BUILD CONSTRUCTION OF A NEW WEIR OPENING AT THE SITE OF THE MCCLELLAN-KERR ARKANSAS NAVIGATION SYSTEM, THREE RIVES, PRE-CONSTRUCTION, ENGINEERING AND DESIGN (PED), DESHA AND

    US · usaspending$175.9MSource ↗

Point-in-time model

Contract change outlook

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Uncollapsed source history

Transactions and modifications

Action dateModificationAction typeExact obligationCurrent totalPotential totalDescriptionSource
Jul 19, 20220Not reported$175,850,000.00Not reportedNot reportedDESIGN-BUILD CONSTRUCTION OF A NEW WEIR OPENING AT THE SITE OF THE MCCLELLAN-KERR ARKANSAS NAVIGATION SYSTEM, THREE RIVES, PRE-CONSTRUCTION, ENGINEERING AND DESIGN (PED), DESHA AND ARKANSAS COUNTIES, AR (HISTORIC CLOSURE STRUCTURE - 145), TICHNOR, ARUSAspending ↗